Overall equipment effectiveness (OEE) combines availability, performance and quality to show how effectively scheduled production time produces good output. Use a defined line, product and time window.

01

Availability measures time loss

Divide operating time by planned production time. If a scheduled 480-minute run includes 60 minutes of downtime, availability is 420 ÷ 480 = 87.5%. Define the boundary for planned exclusions and apply it consistently across reports.

  • Metric: Operating time ÷ planned production time.
02

Performance measures speed loss

Multiply total units by the approved ideal cycle time for the product and divide by operating time. With 1,800 units and an ideal cycle time of 0.2 minutes per unit, performance is 360 ÷ 420 = 85.7%. Investigate readings above 100% for baseline or counting errors.

  • Metric: Ideal cycle time × total units ÷ operating time.
03

Quality measures first-pass output

If 1,710 of 1,800 units meet the first-pass count criteria, the quality factor is 95%. Use rules for rejects, rework and pending results. The first-pass count serves production analysis, while authorized batch disposition follows the quality system.

  • Metric: First-pass good units ÷ total units.
04

Read the combined result

Multiply the three unrounded factors. This example yields 71.25%, equivalent to 342 fully productive minutes out of 480. When denominators are zero, report the metric as unavailable and record why.

  • Result: 87.5% availability × 85.7% performance × 95% quality ≈ 71.3% OEE.
05

Improve within approved controls

Use loss codes to prioritize maintenance, setup and process improvements. Review OEE alongside deviation severity, yield, holds and release performance. Preserve required cleaning, line clearance and process checks when assessing cycle-time savings.